Flat House, Switzerland

Presentation of project

This developer project was realized in Switzerland. Block of flats has more glass elements, but still it was built within only 9 months. All flats were sold before building of rough construction. Block od flats is in energetic class B.

Range of project

90 flat units

Flat House, Switzerland
9 months
Building period
90
Number of units

Used technology

For building of the project we used panels Easy Wood System. Thanks to usage of modern materials, at the moment buildings from these panels are able to evince energetic demands of class B. Costs of living are therefore lower than in standard brick buildings.

Flat House, Switzerland
  1. Fermacell
  2. KVH prisms
  3. Steam isolation
  4. Mineral wool
  5. Isolation
  6. Glue with gauze
  7. Penetration with facade
All variants of panels

Photo gallery

Are you interested in this project?

Do you plan building of a developer project? Contact us and we will be glad to advise you with the project and ensure realization.